subject

A short-circuit evaluation is where each part of an expression is evaluated only as far as necessary to determine whether the entire expression is:.A. True B. false

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 13:30
Jane’s team is using the v-shaped model for their project. during the high-level design phase of the project, testers perform integration testing. what is the purpose of an integration test plan in the v-model of development? a. checks if the team has gathered all the requirements b. checks how the product interacts with external systems c. checks the flow of data in internal modules d. checks how the product works from the client side
Answers: 1
question
Computers and Technology, 22.06.2019 15:30
Why would a programmer use the logical operator and in an if statement? a: when an action is to be taken that requires both conditions to be falseb: when an action is to be taken that requires both conditions to be truec: when an action is to be taken that requires the first condition to be falsed: when an action is to be taken that requires the second condition to be truei took the test and the answer is b.
Answers: 3
question
Computers and Technology, 23.06.2019 09:30
Write an essay on online collaboration, how to do it, the challenges, resolving the challenges, and consider whether the risks are greater than rewards. ( need )
Answers: 1
question
Computers and Technology, 23.06.2019 13:00
Donnie does not have powerpoint. which method would be best for elana to save and share her presentation as is? a pdf a doc an rtf a ppt
Answers: 3
You know the right answer?
A short-circuit evaluation is where each part of an expression is evaluated only as far as necessary...
Questions
question
Mathematics, 09.06.2021 21:30
question
Mathematics, 09.06.2021 21:30
question
English, 09.06.2021 21:30
question
Mathematics, 09.06.2021 21:30
question
Mathematics, 09.06.2021 21:30
question
Mathematics, 09.06.2021 21:30
Questions on the website: 13722363