subject
Engineering, 13.11.2019 23:31 lilbanks4

Jobs arrive to a two-station serial line at a rate of five jobs per hour with deterministic inter-arrival times. station 1 has one machine, which requires exactly 20 minutes to process a job. station 2 has one machine which requires exactly 15 minutes to process a job, provided it is up, but is subject to failures where the mean time to failure is 9 hours and the mean time to repair is one hour. a) what is the total cycle time at workstation 2 (assume no move batching between two stations)? b) assume we have move batching between two stations. in other words, the second workstation receives batches and puts out individual parts. what is the total cycle time of the system with a batch size k-5? c) how can we improve this system (i. e. how can we reduce ct and wip or increase th)? d) suppose we have moderate variability in workstation 1,le·v-c3 +cf)/2-1. what is the total cycle time in the system with a batch size k=5? e) show that ct increases proportionally with batch size (provide a plot) f) how can we improve this system with moderate variability in workstation 1?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Jobs arrive to a two-station serial line at a rate of five jobs per hour with deterministic inter-ar...
Questions
question
Mathematics, 03.03.2021 07:50
question
Biology, 03.03.2021 07:50
question
Mathematics, 03.03.2021 08:00
Questions on the website: 13722359