17.3 The ideal cycle time of an assembly machine is 4 sec. The parts feeder at one of the workstations has a feed rate of 90 components/min and the probability that the components will pass through the selector is 25%. The active length of the feed track (where the high-level sensor is located) is 400 mm. The low-level sensor on the feed track is located 100 mm from the station work head. The components have a length of 10 mm in the feed track direction, and there is no overlapping of parts. Determine (a) How long will it take for the supply of parts to be depleted from the high-level sensor to the low-level sensor once the feeder-selector device is turned off? (b) How long will it take for the parts to be resupplied from the low-level sensor to the high-level sensor, on average, after the feeder-selector device is turned on? (c) What are the time proportions that the feeder-selector device is turned on and turned off?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:20
Avolume of 2.65 m3 of air in a rigid, insulated container fitted with a paddle wheel is initially at 264 k, 5.6 bar. the air receives 432 kj by work from the paddle wheel. assuming the ideal gas model with cv = 0.71 kj/kg • k, determine for the air the amount of entropy produced, in kj/k
Answers: 2
You know the right answer?
17.3 The ideal cycle time of an assembly machine is 4 sec. The parts feeder at one of the workstatio...
Questions
question
Physics, 17.10.2019 13:50
Questions on the website: 13722360