subject
Engineering, 13.10.2020 03:01 kevo2024

A well in the Gulf of Mexico had a very long flow period (longer than the time to get out of transient flow) at a rate of 39,239 stb/day and a bottomhole flowing pressure of 5,200 psia. The volumetric average reservoir pressure for the well was 11,856 psia and the bubble point pressure was 6,504 psia. Because of platform limitations and to estimate whether a planned recompletion will hold up, your boss has asked you to estimate what the bottom hole flowing pressure would be for a flow rate of 20,000 stb/day. The answer you would provide her with is:

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
You know the right answer?
A well in the Gulf of Mexico had a very long flow period (longer than the time to get out of transie...
Questions
question
Mathematics, 05.10.2020 14:01
Questions on the website: 13722361