subject
Mathematics, 20.07.2019 19:30 Prettypq

Awork cell is scheduled to build 120 digital light processor (dlp) assemblies each week. these assemblies are later installed into home theater projection systems. the work cell has 7.5 hours of productive work each day, six days per week. what is takt time for this cell? express your answer in minutes rounded to one decimal place.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Which value is not a solution of 8x^3 – 1 = 0
Answers: 1
question
Mathematics, 21.06.2019 18:50
Given: pqrs is a parallelogram prove: pr and qs bisect each other at t
Answers: 1
question
Mathematics, 21.06.2019 23:40
For a science project, a high school research team conducted a survey of local air temperatures. based on the results of the survey, the found that the average temperatures were around 10 degrees higher than expected. this result was wrong. the trouble with the survey was that most of the locations were exposed to direct sunlight and located over asphalt or sand, which resulted in higher temperatures than normal. this is a classic example of an error in which phase of inferential statistics?
Answers: 1
question
Mathematics, 22.06.2019 01:00
1) your friend taylor missed class today and needs some identifying solutions of systems. explain to taylor where to find the solution(s) of any system using its graph 2)taylor graphs the following in desmos and decides that f(x) = g(x) at x = 0, x = 1, & x = 3. f(x) = 2x+1g(x) = 2x2+1 provide taylor some feedback that explains which part of the answer was incorrect and why.
Answers: 1
You know the right answer?
Awork cell is scheduled to build 120 digital light processor (dlp) assemblies each week. these assem...
Questions
question
Mathematics, 09.03.2021 17:20
question
Mathematics, 09.03.2021 17:20
Questions on the website: 13722361