subject
Mathematics, 18.07.2019 18:30 amandavaldez5577

Morgan can paint a standard-sized house in about 5 days. for his latest job, morgan hires two assistants. at what rate must these assistants work for morgan to meet a deadline of two days?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
What does independent variable and dependent variable mean in math?
Answers: 2
question
Mathematics, 21.06.2019 23:00
36x2 + 49y2 = 1,764 the foci are located at: (-√13, 0) and (√13,0) (0, -√13) and (0,√13) (-1, 0) and (1, 0)edit: the answer is (- the square root of 13, 0) and (the square root of 13, 0)
Answers: 1
question
Mathematics, 22.06.2019 00:30
A)a square brown tarp has a square green patch green in the corner the side length of the tarp is (x + 8) and the side length of the patch is x what is the area of the brown part of the tarpb)a square red placemat has a gold square in the corner the side length of the gold square is (x - 2) inches with the width of the red region is 4 in what is the area of the red part of the placemat
Answers: 2
question
Mathematics, 22.06.2019 00:40
The formula for the volume of a right square pyramid is given below, where a is the side length of the base and h is the height.
Answers: 1
You know the right answer?
Morgan can paint a standard-sized house in about 5 days. for his latest job, morgan hires two assist...
Questions
question
Mathematics, 13.03.2021 07:00
question
Mathematics, 13.03.2021 07:00
question
English, 13.03.2021 07:00
Questions on the website: 13722359