subject
Mathematics, 18.07.2019 20:10 Reebear8372

Problem ii: cool denim company produces two items called boot jeans and skinny jackets. a unit of boot jeans requires 8 yards of denim and 2 pounds of r22 dye. a unit of skinny jackets requires 15 yards of denim and 3 pounds of r22 dye. the amount of cutting machine time needed on a unit of boot jeans is 1.5 hours, while the amount of cutting machine time needed on a unit of skinny jackets is 1 hour. the assembly time needed by a unit of boot jeans is 2.5 hours while the assembly time needed by a unit of skinny jackets is 1.75 hours. the amount of yards of denim available per production period is 280 yards. the company has secured 66 pounds of the special r22 dye for the production period. the company has three cutting machines which yield an effective combined time of 47 hours per production period. the total amount of assembly time available to the company per production period equals 130 hours. the company has received and accepted pre-production commitments of at least 5 units of boot jeans for the upcoming production period, and wants to keep production of skinny jackets to a maximum of 12 units in order not to overflow the market for the following period. the company cost accountants have determined that a single unit of boot jeans contributes $15 to profits, while a single unit of skinny jackets contributes $22 to profits. the company’s objective is to maximize profit. if you are the production manager, how many units of boot jeans and skinny jackets should you produce so that the profit is maximized? 1. what are the decision variables (specify the units)? 2. what is the objective function? 3. are there any redundant constraint(s)? which one(s), if any? 4. identify the corner points of the feasibility region. 5. what is the optimal production mix? 6. what is the optimal profit level? 7. if the manager is able to secure an additional pound of special r22 dye for $5/lb., should it be bought? why?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Calculate the density of benzene if 300ml of it weighs 263g. a. 0.88 g/ml b. 1.14 g/ml c. 78,900 g/ml d. 37 g/ml
Answers: 2
question
Mathematics, 21.06.2019 19:00
Atheater wants to build movable steps that they can use to go on and off the stage. they want the steps to have enough space inside so they can also be used to store props. how much space is inside the steps?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Guys i need ! graded assignment grade 8 checkpoint 2, part 2 answer the questions below. when you are finished, submit this assignment to your teacher by the due date for full credit. total score: of 9 points (score for question 1: of 4 points) 1. the cost of renting a car for a day is $0.50 per mile plus a $15 flat fee. (a) write an equation to represent this relationship. let x be the number of miles driven and y be the total cost for the day. (b) what does the graph of this equation form on a coordinate plane? explain. (c) what is the slope and the y-intercept of the graph of the relationship? explain.
Answers: 1
question
Mathematics, 21.06.2019 21:00
A.s.a.! this is a similarity in right triangles. next (solve for x)a.) 12b.) 5c.) 12.5d.) [tex] 6\sqrt{3} [/tex]
Answers: 2
You know the right answer?
Problem ii: cool denim company produces two items called boot jeans and skinny jackets. a unit of b...
Questions
question
Mathematics, 18.07.2019 23:00
question
English, 18.07.2019 23:00
question
Social Studies, 18.07.2019 23:00
Questions on the website: 13722361