You are working on a project that has 12 activities and want to perform a cpm analysis on the project. you determine the critical path consists of only five activities. you then compute the variances for the five critical path activities and these variances are 3, 4, 2, 1, and 6 days. if the desired completion date for the project is 35 days and the expected completion date for the project is 40 days, what is the probability that the project will be completed by the desired completion date?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:40
Which statement accurately explains whether a reflection over the y-axis and a 270° counterclockwise rotation would map figure acb onto itself? a coordinate plane with figure acb with point a at 1, 1, c at 3, 4 and b at 5, 1 yes, a″c″b″ is located at a″(1, 1), c″(4, 3), and b″(1, 5) yes, a″c″b′ is located at a″(1, 1), c″(3, 4), and b″(5, 1) no, a″c″b″ is located at a″(1, 1), c″(4, 3), and b″(1, 5) no, a″c″b″ is located at a″(1, 1), c″(3, 4), and b″(5, 1)
Answers: 2
question
Mathematics, 21.06.2019 22:00
Harry and jay are both flying on the same plane with an airline that randomly assigns seats to passengers. of the 182 total seats on the plane, 62 are window seats, 58 are middle seats, and the rest are aisle seats. what is the approximate probability that both harry and jay will be assigned aisle seats on the same plane? a. 11.48% b. 3.3% c. 2.08% d. 26.26%
Answers: 3
question
Mathematics, 21.06.2019 23:30
Maddie's rectangular kitchen has an area of 10 square yards and a length of 3 3/4 yards.how many yards wide is maddie's kitchen?
Answers: 1
question
Mathematics, 22.06.2019 03:30
Fawn bought a total of 70 cakes for a tea party. she spent $3,025. fawn bought vanilla cakes for $22 each and a fruit filled cake for $55 each. the system of equations below can be used to find the number of vanilla cakes, v, and the number of fruit filled cakes, f, fawn purchased. which system of equations has the same solution as the system below.
Answers: 2
You know the right answer?
You are working on a project that has 12 activities and want to perform a cpm analysis on the projec...
Questions
question
Mathematics, 23.09.2019 22:30
Questions on the website: 13722363