subject
Mathematics, 19.12.2019 00:31 savannahvargas512

Atotal of 13,000 sheet metal stampings must be produced in the press department during the next three days. manually operated presses (one operator per press) will be used to complete the job and the cycle time is 27 sec. each press must be set up with a punch-and-die set before production starts. setup time is 2.0 hr, and availability is assumed to be 100%. how many presses and operators must be devoted to this production during the three days, if there are 7.5 hr of available time per machine per day?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Benito is selecting samples of five values from the table, which row will result in the greatest mean? population data row 1 4 2 2 3 3 row 2 3 3 4 3 2 row 3 2 4 3 4 3 row 4 3 4 4 7 3 row 1 row 2 r
Answers: 3
question
Mathematics, 21.06.2019 19:30
Prove the divisibility of the following numbers: 25^9 + 5^7 is divisible by 30.also, read as (25 to the power of 9) + (5 to the power of 7) is divisible by 30. blank x 30what is the blank? ( it should be expressed in exponent form)
Answers: 1
question
Mathematics, 21.06.2019 21:10
For each sentence below, find the value of x that makes each sentence true. (515) 5 = 25* x= (813)2 = 4* x=
Answers: 2
question
Mathematics, 21.06.2019 22:30
Complete the equation of the live through (-1,6) (7,-2)
Answers: 1
You know the right answer?
Atotal of 13,000 sheet metal stampings must be produced in the press department during the next thre...
Questions
Questions on the website: 13722360