subject
Mathematics, 20.08.2019 18:00 janetshirinyan

Paul can install a
300-square-foot hardwood floor in 18 hours. matt can install the same
floor in 22 hours. how long would it take paul and matt to install the
floor working together?
4 hours
9.9
hours
13.2 hours
30
hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Using the quadratic formula find the zeros of the given polynomial -5x^2+3x-11
Answers: 3
question
Mathematics, 21.06.2019 17:00
The angle of a triangle are given as 6x,(x-3), and (3x+7). find x then find the measures of the angles
Answers: 2
question
Mathematics, 21.06.2019 23:40
Determine the standard form of the equation of the line that passes through (-2,0) and (8,-5)
Answers: 1
question
Mathematics, 22.06.2019 03:30
What is the midpoint of np if n (1,9) and p (-5-1)
Answers: 1
You know the right answer?
Paul can install a
300-square-foot hardwood floor in 18 hours. matt can install the same
...
Questions
question
Mathematics, 04.02.2021 18:10
question
English, 04.02.2021 18:10
Questions on the website: 13722363