subject
Mathematics, 06.03.2020 19:24 vbucks72

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The angle of a triangle are given as 6x,(x-3), and (3x+7). find x then find the measures of the angles
Answers: 3
question
Mathematics, 21.06.2019 18:00
Suppose you are going to graph the data in the table. minutes temperature (°c) 0 -2 1 1 2 3 3 4 4 5 5 -4 6 2 7 -3 what data should be represented on each axis, and what should the axis increments be? x-axis: minutes in increments of 1; y-axis: temperature in increments of 5 x-axis: temperature in increments of 5; y-axis: minutes in increments of 1 x-axis: minutes in increments of 1; y-axis: temperature in increments of 1 x-axis: temperature in increments of 1; y-axis: minutes in increments of 5
Answers: 2
question
Mathematics, 21.06.2019 22:30
The area of the map is the product of the length and width. write and expression for the area as the product of the two binomials do not multiply
Answers: 2
question
Mathematics, 21.06.2019 23:00
Square a has a side length of (2x-7) and square b has a side length of (-4x+18). how much bigger is the perimeter of square b than square a?and show all work! you so
Answers: 2
You know the right answer?
The operations manager of a body and paint shop has five cars to schedule for repair. He would like...
Questions
question
Mathematics, 24.10.2019 03:00
question
Social Studies, 24.10.2019 03:00
question
History, 24.10.2019 03:00
question
Chemistry, 24.10.2019 03:00
Questions on the website: 13722362