subject
Mathematics, 31.03.2020 19:27 nini31575

A programmer plans to develop a new software system. In planning for the operating system that he will use, he needs to estimate the percentage of computers that use a new operating system. How many computers must be surveyed in order to be 90% confident that his estimate is in error by no more than one percentage point?

a. Assume that nothing is known about the percentage of computers with new operating systems. n = ?
b. Assume that a recent survey suggests that 99% of computers use a new operating system. n = ?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
The head librarian at the library of congress has asked her assistant for an interval estimate of the mean number of books checked out each day. the assistant provides the following interval estimate: from 740 to 920 books per day. what is an efficient, unbiased point estimate of the number of books checked out each day at the library of congress?
Answers: 3
question
Mathematics, 21.06.2019 15:40
36 inches/second = yards/minute how many yards?
Answers: 1
question
Mathematics, 22.06.2019 00:30
Bo is buying a board game that usually costs bb dollars. the game is on sale, and the price has been reduced by 18\%18%. which of the following expressions could represent how much bo pays for the game? choose 2 answers: choose 2 answers: (choice a) a 0.82b0.82b (choice b) b 1.18b1.18b (choice c) c b-0.18b−0.18 (choice d) d b-18b−18 (choice e) e b-0.18bb−0.18b
Answers: 2
question
Mathematics, 22.06.2019 03:20
Which are the possible side lengths of a triangle?
Answers: 1
You know the right answer?
A programmer plans to develop a new software system. In planning for the operating system that he wi...
Questions
question
Mathematics, 21.07.2019 10:00
question
Advanced Placement (AP), 21.07.2019 10:00
Questions on the website: 13722367