subject
Mathematics, 03.04.2020 00:55 thonio091

Bruce's Material Company hauls gravel to a construction sito, using a small truck and a large truck. The carrying capacity and operating cost per load are given in the accompanying table. Bruce must deliver a
minimum of 280 cubic yards per day to satisfy his contract with the builder. The union contract with his drivers requires that the total number of loads per day is a minimum of 10. How many loads should be
made in each truck per day to minimize the total cost?
Small Truck Large Truck
Capacity (yd) 40
70
Cost per Load
$69 $56
In order to minimize the total cost, the number of loads in a small truck that should be made is
and the number of loads in a large truck that should be made is

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
H(x)=4x2-5x h(-3) what is the answer?
Answers: 1
question
Mathematics, 21.06.2019 15:40
Use properties to rewrite the given equation. which equations have the same solution as 2.3p – 10.1 = 6.5p – 4 – 0.01p?
Answers: 2
question
Mathematics, 21.06.2019 17:00
An air conditioning system can circulate 350 cubic feet of air per minute. how many cubic yards of air can it circulate per minute?
Answers: 3
question
Mathematics, 21.06.2019 17:10
How many lines can be drawn through points j and k? 0 1 2 3
Answers: 2
You know the right answer?
Bruce's Material Company hauls gravel to a construction sito, using a small truck and a large truck....
Questions
question
Mathematics, 03.07.2019 09:30
Questions on the website: 13722363