Two carpenters are going to work together building a shed. The first carpenter estimates that it will take him 3 hours to build a shed, the other carpenter estimates it will take him 7 hours to build a shed. Working together, how long should it take them to build one shed?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
The isosceles triangle has two sides of equal length, a, that sre longer than the length of the base ,b. the equation 2a+b=15.7 can be used to find the sides length. if one of the longer sides is 6.3 centimeters what is the length of the base
Answers: 2
question
Mathematics, 21.06.2019 16:40
The table shows the total distance that myra runs over different time periods. which describes myra’s distance as time increases? increasing decreasing zero constant
Answers: 1
question
Mathematics, 21.06.2019 17:20
Consider the proof. given: segment ab is parallel to line de. prove: what is the missing statement in step 5?
Answers: 3
question
Mathematics, 21.06.2019 20:00
The radius of the earth is two times the radius of the moon. what fraction of the volume of the earth is the volume of the moon?
Answers: 1
You know the right answer?
Two carpenters are going to work together building a shed. The first carpenter estimates that it wil...
Questions
question
Mathematics, 06.01.2022 04:40
question
Mathematics, 06.01.2022 04:40
question
Mathematics, 06.01.2022 04:40
Questions on the website: 13722362