subject
Mathematics, 17.04.2020 21:11 jahmanilittlejotz1pe

Some Field Experience in the use of an Accelerated Method in Estimating 28-Day Strength of Concrete" considered regressing y =28-day standard-cured strength (psi) against x =accelerated strength (psi). Suppose the equation of the true regression line is y =1800 +1.3x.

a. What is the expected value of 28-day strength when accelerated strength= 2500? (2 marks)
b. By how much can we expect 28-day strength to change when accelerated strength increases by 1 psi? (4 marks)
c. Answer part (b) for an increase of 100 psi. (2 marks)
d. Answer part (b) for a decrease of 100 ps

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Answer the following for 896.31 cm= km 100cm = 1m 1000m = 1km a) 0.0089631 b) 0.0089631 c) 8.9631 d) 89.631
Answers: 1
question
Mathematics, 21.06.2019 17:00
Abe is a triangle. can you use the sss postulate or the sas postulate to prove triangle abc = triangle aed? by sss only neither apply both apply by sas only
Answers: 2
question
Mathematics, 21.06.2019 17:30
Marco has $38.43 dollars in his checking account. his checking account is linked to his amazon music account so he can buy music. the songs he purchases cost $1.29. part 1: write an expression to describe the amount of money in his checking account in relationship to the number of songs he purchases. part 2: describe what the variable represents in this situation.
Answers: 2
question
Mathematics, 21.06.2019 18:00
The base of a triangle exceeds the height by 7 centimeters. if the area is 400 square centimeters, find the length of the base and the height of the triangle.
Answers: 1
You know the right answer?
Some Field Experience in the use of an Accelerated Method in Estimating 28-Day Strength of Concrete"...
Questions
Questions on the website: 13722359