subject
Mathematics, 06.05.2020 05:25 groovyghoulie5630

Provide the width of project duration range (not dates) at plus and minus ten percent about the probability of expected completion time based on PERT and MCS results. For example, if the expected completion time is d days, and the corresponding probability is p%, find the duration range corresponding to p-10% to p 10% probability

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Determine whether the set of whole numbers is closed under addition. explain why the set is or is not closed. give an example.
Answers: 1
question
Mathematics, 21.06.2019 18:00
Carmen begins her next painting on a rectangular canvas that is 82.7 cm long and has a area of 8,137.68 cm2. will the painting fit in a frame with an opening that is 82.7 cm long and 95 cm wide? explain
Answers: 3
question
Mathematics, 21.06.2019 20:00
Elizabeth is using a sample to study american alligators. she plots the lengths of their tails against their total lengths to find the relationship between the two attributes. which point is an outlier in this data set?
Answers: 1
question
Mathematics, 22.06.2019 02:30
Researchers are conducting experiments to determine the role of alcohol in the development of depression. after the study is complete, they determine that the relative risk of developing depression is 1.55 with a 95 % ci of 1.2 -1.9. each group is then divided into nonsmokers and smokers. the relative risk for the nonsmokers is 1.12 with a 95% ci of 0.87-1.37. the relative risk for the smokers is 1.7 with a 95 % cl of 1.5-1.9. what type of bias may affect this study? a. procedure bias b. recall bias c. selection bias d. confounding e. lead-time bias
Answers: 2
You know the right answer?
Provide the width of project duration range (not dates) at plus and minus ten percent about the prob...
Questions
question
Health, 12.09.2019 05:30
question
Mathematics, 12.09.2019 05:30
Questions on the website: 13722359