subject
Mathematics, 21.06.2020 01:57 kalestalker10

For 120 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 8 bottles. The average across all 960 bottles (120 days, 8 bottles per day) was 46 degrees Fahrenheit. The standard deviation across all bottles was 0.8 degree. Round your answer to 4 digits after the decimal point if it is not an integer. Do NOT use comma in your numeric answers. Sample size is .Number of samples is .When constructing a x-bar chart:The center line should be .ESD(x-bar) equals .The upper control limit (UCL) should be .The lower control limit (LCL) should be .

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Problem situation: caren is making rice and beans. she can spend no more than $10 on ingredients. she buys one bag of rice for $4.99. beans cost $0.74 per pound. how many pounds of beans, x, can she buy? inequality that represents this situation: 10≥4.99+0.74x drag each number to show if it is a solution to both the inequality and the problem situation, to the inequality only, or if it is not a solution.
Answers: 1
question
Mathematics, 22.06.2019 02:30
Match each set of points with the quadratic function whose graph passes through those points
Answers: 1
question
Mathematics, 22.06.2019 03:30
Which polynomial is in standard form? 3xy+6x®y2 - 4x4y + 19x? y* 18x5 - 7x{y-2xy2 + 1774 x5y5 - 3xy - 11x? y2 +12 15+ 12xy2 - 11x®ys +5x? y2 ?
Answers: 1
question
Mathematics, 22.06.2019 05:00
At the play,8 students from mr.franks room got a seat.if there were 17 childern from room 24,how many childern did not get a seat ?
Answers: 2
You know the right answer?
For 120 consecutive days, a process engineer has measured the temperature of champagne bottles as th...
Questions
question
Mathematics, 29.10.2019 01:31
question
Mathematics, 29.10.2019 01:31
Questions on the website: 13722360