subject
Mathematics, 30.08.2020 01:01 kamerin46

A small production manager accepted a project that would require 32 hours to complete with a compensation rate of $28/hour. After calculating costs for allocating resources to the project and accounting for paying employees for the project, the manager determined it would cost $17/hour for the company to complete the project. How much profit should the manager's company expect to make given these numbers? (You do not need to include the units. You only need to enter your answer as a number.)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
You are looking at two area rugs for your bedroom. one is a square with side lengths of 6.3 feet. the other is a rectangle that is 4.8 feet by 8.2 feet. which rug will cover the greatest area? how much more area will it cover? with work plzz and u so much
Answers: 1
question
Mathematics, 21.06.2019 13:30
Liam's parents are driving three times as fast as liam is biking, but they left later than he did. if his parents caught up with him two hours after he left, how much later than liam did they leave?
Answers: 2
question
Mathematics, 21.06.2019 18:30
An optical inspection system is used to distinguish among different part types. the probability of a correct classification of any part is 0.92. suppose that three parts are inspected and that the classifications are independent. let the random variable x denote the number of parts that are correctly classified. determine the probability mass function of x. round your answers to four decimal places (e.g. 98.7654). x f(x) 0 1 2 3
Answers: 2
question
Mathematics, 21.06.2019 18:30
Acoin bank containing only dimes and quarters has 12 more dimes than quarters. the total value of the coins is $11. how many quarters and dimes are in the coin bank?
Answers: 1
You know the right answer?
A small production manager accepted a project that would require 32 hours to complete with a compens...
Questions
Questions on the website: 13722360