A project manager is calculating work forecasts. The manager's team completed of a job in 16 days. At this rate,
the manager says that the team completed of the project each day.
What was the manager's error?
The manager is correct. There was no error.
O The manager divided by 16 instead of dividing
O The manager divided 16 by instead of dividing by 16.
The manager divided 16 by instead of multiplying 16 by
The manager divided by 16 instead of multiplying 16 by
by 16
Answers: 3
Mathematics, 21.06.2019 13:30
What are correct trigonometric ratios that could be used to determine the length of ln
Answers: 3
Mathematics, 21.06.2019 22:10
In which direction does the left side of the graph of this function point? f(x) = 3x3 - x2 + 4x - 2
Answers: 2
Mathematics, 22.06.2019 00:00
The statements below can be used to prove that the triangles are similar. ? △abc ~ △xyz by the sss similarity theorem. which mathematical statement is missing? ∠b ≅ ∠y ∠b ≅ ∠z
Answers: 2
A project manager is calculating work forecasts. The manager's team completed of a job in 16 days. A...
Mathematics, 29.10.2020 14:00
Biology, 29.10.2020 14:00
Advanced Placement (AP), 29.10.2020 14:00
Spanish, 29.10.2020 14:00
Biology, 29.10.2020 14:00
Arts, 29.10.2020 14:00
Biology, 29.10.2020 14:00
Computers and Technology, 29.10.2020 14:00