There is a machine shop with only one machine. Arrival rate to the shop is 10 parts per hour on average. The average machining time is 5 minutes per part. The machine shop is considering replacing the old machine with a new high speed machine, which is expected to reduce machining time by 20% (4 minutes per part). Also, the shop is expecting attracting 20% more customers (12 parts per hour), with the new machine. Compare the expected time in the shop for each part with the old and with the new machine. How much % can we reduce the time in the shop by introducing the new machine?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Which triangles area would be calculated using the trigonometric area formula
Answers: 1
question
Mathematics, 21.06.2019 16:00
Find the required measurements of the following trapezoids. a = 8 cm b = 16 cm h = 10 cm
Answers: 2
question
Mathematics, 21.06.2019 19:00
The following division is being performed using multiplication by the reciprocal find the missing numbers is 5/12 divided by x/3 equals 5/12 times x/10 equals 1/x
Answers: 2
question
Mathematics, 21.06.2019 19:30
Consider this equation. |y + 6| = 2 what can be concluded of the equation? check all that apply. there will be one solution. there will be two solutions. the solution to –(y + 6) = 2 will be also be a solution to the given absolute value equation. the solution(s) will be the number(s) on the number line 2 units away from –6. the value of y must be positive since the variable is inside absolute value signs.
Answers: 1
You know the right answer?
There is a machine shop with only one machine. Arrival rate to the shop is 10 parts per hour on aver...
Questions
question
Mathematics, 29.04.2021 22:40
question
Mathematics, 29.04.2021 22:40
question
Mathematics, 29.04.2021 22:40
question
Mathematics, 29.04.2021 22:40
Questions on the website: 13722360