subject
Mathematics, 21.09.2020 04:01 bethdove9466

A ship must be unloaded by two cranes in 12 hours. Both cranes worked for 8 hours and then one of them broke. The rest of the work was done by the other crane in 7 hours. How long would each crane take to do the entire job if it was working alone? Thank you!

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
Which equation can be used to solve for the unknown number? seven less than a number is thirteen. n-7=13 7-n=13 n+7=13 n+13=7
Answers: 1
question
Mathematics, 21.06.2019 19:30
If (17, 4) is an ordered pair of the inverse of f(x), which of the following is an ordered pair of the function f(x)? a. (17,4) b. (4.17) c. (4,0) d. 0,17)
Answers: 2
question
Mathematics, 21.06.2019 21:40
The sides of a parallelogram are 24cm and 16cm. the distance between the 24cm sides is 8 cm. find the distance between the 16cm sides
Answers: 3
question
Mathematics, 22.06.2019 00:40
Ineed the question and choices are in the
Answers: 2
You know the right answer?
A ship must be unloaded by two cranes in 12 hours. Both cranes worked for 8 hours and then one of th...
Questions
question
Mathematics, 19.04.2021 18:00
question
Biology, 19.04.2021 18:00
question
Biology, 19.04.2021 18:00
question
Mathematics, 19.04.2021 18:00
Questions on the website: 13722367