Help me out please an thank you
...
Answers: 2
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 00:00
Tony is charged $ 50 and additional $0.15 per miles for renting a car. a) represent the cost of renting a car with an equation,and the determine the cost if he drove it70 miles.b) what would be the cost of a car rental if the car was driven 250 miles? show work
Answers: 1
Mathematics, 22.06.2019 01:30
Which point does not lie on the graph k(x) = 8 -3 √x a. (-64, 12) b. (125, 3) c. (343, 1) d. (8, 5)
Answers: 2
SAT, 29.11.2021 20:30
Mathematics, 29.11.2021 20:30
Mathematics, 29.11.2021 20:30
Social Studies, 29.11.2021 20:30
History, 29.11.2021 20:30
Engineering, 29.11.2021 20:30
English, 29.11.2021 20:30
Mathematics, 29.11.2021 20:30
History, 29.11.2021 20:30