subject
Mathematics, 11.12.2020 06:40 isabelperez063

A shoe shop makes shoes and boots. To make boots, 8 mins is needed on the lathe and 8 mins is needed on the sander. To make a shoe, 10 mins is needed on the lathe and 20 mins on the sander. The lathe operator works 6hrs/day and the sander operator works 7hrs/day. How many shoes and boots can they make in one day working at this capacity. Write 2 equations.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Deepak plotted these points on the number line. point a: –0.3 point b: – 3 4 point c: – 11 4 point d: –0.7 which point did he plot incorrectly?
Answers: 2
question
Mathematics, 21.06.2019 22:00
Question 10 of 211 pointuse the elimination method to solve the system of equations. choose thecorrect ordered pair.10x +2y = 643x - 4y = -36a. (4,12)b. (-3, 11)c. (2,10)d. (-5, 8)
Answers: 1
question
Mathematics, 21.06.2019 23:00
Someone answer this asap for gabriella uses the current exchange rate to write the function, h(x), where x is the number of u.s. dollars and h(x) is the number of euros, the european union currency. she checks the rate and finds that h(100) = 7.5. which statement best describes what h(100) = 75 signifies? a. gabriella averages 7.5 u.s. dollars for every 100 euros. b. gabriella averages 100 u.s. dollars for every 25 euros. c. gabriella can exchange 75 u.s. dollars for 100 euros. d. gabriella can exchange 100 u.s. dollars for 75 euros.
Answers: 1
question
Mathematics, 22.06.2019 01:30
Atransformation was performed on rectangle c as shown in the graph. what type of transformation was performed? does that transformation result in congruent shapes? you people
Answers: 1
You know the right answer?
A shoe shop makes shoes and boots. To make boots, 8 mins is needed on the lathe and 8 mins is needed...
Questions
question
Mathematics, 18.03.2021 01:50
question
Biology, 18.03.2021 01:50
question
Mathematics, 18.03.2021 01:50
Questions on the website: 13722360