subject
Mathematics, 18.10.2019 18:50 small77

Acarpenter contracts to do a job. the costs for the job are$2,000 for materials,$500 for labor, and $150 for equipment rental. what would be the total cost of the job if the cost of materials were increased by 15%. 1.$300 2.2300 3.2600 4.2800 5.2950

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
What numbers are included in the set of integers? what numbers are not included?
Answers: 2
question
Mathematics, 21.06.2019 20:20
Pls brainliest will be awarded if answer is correct
Answers: 1
question
Mathematics, 21.06.2019 20:30
Is the point (0, 8) on the x-axis or y-axis? how do you know?
Answers: 2
question
Mathematics, 22.06.2019 01:00
The stem-and-leaf plot shows the heights in centimeters of teddy bear sunflowers grown in two different types of soil. soil a soil b 5 9 5 2 1 1 6 3 9 5 1 0 7 0 2 3 6 7 8 2 1 8 3 0 9 key: 9|6 means 69 key: 5|8 means 58 calculate the mean of each data set. calculate the mean absolute deviation (mad) of each data set. which set is more variable? how do you know?
Answers: 2
You know the right answer?
Acarpenter contracts to do a job. the costs for the job are$2,000 for materials,$500 for labor, and...
Questions
question
Biology, 01.02.2021 06:00
question
Business, 01.02.2021 06:00
question
Mathematics, 01.02.2021 06:00
question
Mathematics, 01.02.2021 06:10
Questions on the website: 13722360