subject
Mathematics, 02.02.2020 01:43 bellaisbored202

Ryan can dig a 10 ft by 10ft hole in five hours. jim can dig the same hole in six hours. how long would it take them if they worked together?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
How to choose the sign of the radical in the denominator of the formula for the distance from a point to a line.
Answers: 2
question
Mathematics, 21.06.2019 19:30
Choose the more precise measurement. 26.4 cm or 8.39 cm
Answers: 1
question
Mathematics, 21.06.2019 20:00
15m is what percent of 60m; 3m; 30m; 1.5 km? the last one is km not m
Answers: 1
question
Mathematics, 21.06.2019 21:20
The edge of a cube was found to be 30 cm with a possible error in measurement of 0.4 cm. use differentials to estimate the maximum possible error, relative error, and percentage error in computing the volume of the cube and the surface area of the cube. (round your answers to four decimal places.) (a) the volume of the cube maximum possible error cm3 relative error percentage error % (b) the surface area of the cube maximum possible error cm2 relative error percentage error %
Answers: 3
You know the right answer?
Ryan can dig a 10 ft by 10ft hole in five hours. jim can dig the same hole in six hours. how long wo...
Questions
question
Mathematics, 21.10.2020 03:01
question
Mathematics, 21.10.2020 03:01
question
Mathematics, 21.10.2020 03:01
question
Mathematics, 21.10.2020 03:01
question
Mathematics, 21.10.2020 03:01
Questions on the website: 13722360