subject
Mathematics, 24.02.2021 14:00 bri1814

A manager found that 4 out of 36 parts manufactured in one day were defective. Approximately, what percentage of the parts was NOT defective?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at __ , and the third quartile would be drawn at __ link to graph: .
Answers: 1
question
Mathematics, 21.06.2019 18:30
Let f(x) = 3 − x . find the average rate of change of f(x) from x = a to x = a + h and simplify your answer so that no single factor of h is left in the denominator.
Answers: 1
question
Mathematics, 21.06.2019 21:00
M.xyz =radians. covert this radian measure to its equivalent measure in degrees.
Answers: 1
question
Mathematics, 21.06.2019 23:30
In a study of the relationship between socio-economic class and unethical behavior, 129 university of california undergraduates at berkeley were asked to identify themselves as having low or high social-class by comparing themselves to others with the most (least) money, most (least) education, and most (least) respected jobs. they were also presented with a jar of individually wrapped candies and informed that the candies were for children in a nearby laboratory, but that they could take some if they wanted. after completing some unrelated tasks, participants reported the number of candies they had taken. it was found that those who were identiď¬ed as upper-class took more candy than others. in this study, identify: (a) the cases, (b) the variables and their types, (c) the main research question, (d) identify the population of interest and the sample in this study, and (e) comment on whether or not the results of the study can be generalized to the population, and if the ď¬ndings of the study can be used to establish causal relationships.
Answers: 2
You know the right answer?
A manager found that 4 out of 36 parts manufactured in one day were defective. Approximately, what...
Questions
question
English, 06.11.2020 09:20
question
Mathematics, 06.11.2020 09:20
question
Mathematics, 06.11.2020 09:20
question
Mathematics, 06.11.2020 09:20
question
English, 06.11.2020 09:20
Questions on the website: 13722361