subject
Mathematics, 25.02.2021 18:30 jfedele7900

In July, a new endoscopy suite will be opened in your organization. Projections are that 80 endoscopies will be performed per day. At the same time, an electrophysiology lab will be opening, with anticipation of 8 procedures being done there per day. You have done some preliminary work sampling to determine how much time it will take to code these types of cases and arrived at 10 minutes per endoscopy and 15 minutes per EP procedure. Calculate the number of FTEs that you will need to hire to cover the additional workload. Base you calculations on a 7.5-hour workday.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
Abig remake 100 loaves of bread in one day how many loaves does the bakery make in 6 days
Answers: 1
question
Mathematics, 21.06.2019 20:00
Two line segments are shown in the figure below. suppose that the length of the line along the x-axis is 6, and the length of the hypotenuse of the triangle is 10. what is the equation of the hypotenuse line (shown in red, below)?
Answers: 3
question
Mathematics, 22.06.2019 03:00
More than 450450 students traveled to a state park for a field trip. the school allowed 66 students to travel by car, and the rest traveled on 1111 buses, each of which held the same number of students. if there were ss students in each bus, which inequality best represents this situation?
Answers: 1
question
Mathematics, 22.06.2019 04:10
Random variables x poisson~ ( a) ,y poisson ~ ( a) . x and y are independent. if 2 1, 2 1. u =2x+ y-1, v=2x- y +1. find: ) cov (u ,v ).
Answers: 2
You know the right answer?
In July, a new endoscopy suite will be opened in your organization. Projections are that 80 endoscop...
Questions
question
Chemistry, 17.12.2020 18:00
question
Mathematics, 17.12.2020 18:00
question
Mathematics, 17.12.2020 18:00
question
Mathematics, 17.12.2020 18:00
question
Business, 17.12.2020 18:00
question
Mathematics, 17.12.2020 18:00
Questions on the website: 13722363