Mathematics, 24.03.2021 02:40 karlacr5117
The time required to paint a particular house varies inversely with the number of painters. If it takes 6 hours for 13 painters to complete the paint job, how long would it take if there are 10 painters?
Answers: 2
Mathematics, 21.06.2019 14:20
Ac contractor is building a new subdivision outside of the city. he has started work on the first street and is planning on the other streets to run in a direction parallel to the first. the second street will pass through (-2,4) find the equation of the location of the second street in standard form. a.2x+y=2 b. x-y=2 c.2x+y=2 d.x+y=2
Answers: 2
Mathematics, 21.06.2019 20:00
For problems 29 - 31 the graph of a quadratic function y=ax^2 + bx + c is shown. tell whether the discriminant of ax^2 + bx + c = 0 is positive, negative, or zero.
Answers: 1
The time required to paint a particular house varies inversely with the number of painters. If it ta...
Social Studies, 10.03.2020 17:07
Mathematics, 10.03.2020 17:08
Computers and Technology, 10.03.2020 17:08
English, 10.03.2020 17:09