subject
Mathematics, 09.04.2021 22:00 belladaviau1338

For every part produced by a factory, there are 5 ounces of scrap aluminum that can te recycled. There are 16 ounces in pound and 2,000 pounds in 1 ton. How many parts must
the factory produce so that there is 1 ton of scrap aluminum for recyeling?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
What are the solutions to the following equation? |m| = 8.5 the value of m is equal to 8.5 and because each distance from zero is 8.5.
Answers: 3
question
Mathematics, 22.06.2019 02:00
Consider the linear function that is represented by the equation y= 4x+5
Answers: 1
question
Mathematics, 22.06.2019 02:30
According to a research study, parents with young children slept 6.4 hours each night last year, on average. a random sample of 18 parents with young children was surveyed and the mean amount of time per night each parent slept was 6.8. this data has a sample standard deviation of 0.9. (assume that the scores are normally distributed.) researchers conduct a one-mean hypothesis at the 5% significance level, to test if the mean amount of time parents with young children sleep per night is greater than the mean amount of time last year. the null and alternative hypotheses are h0: μ=6.4 and ha: μ> 6.4, which is a right-tailed test. the test statistic is determined to be t0=1.89 using the partial t-table below, determine the critical value(s). if there is only one critical value, leave the second answer box blank.
Answers: 3
question
Mathematics, 22.06.2019 02:50
Explain how to graph a scatterplot and its regression line using a regression calculator.
Answers: 3
You know the right answer?
For every part produced by a factory, there are 5 ounces of scrap aluminum that can te recycled. Th...
Questions
question
Mathematics, 15.07.2019 02:20
Questions on the website: 13722361