subject
Mathematics, 20.07.2021 04:10 hartzpeyton136

A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is lost from the bucket at a constant rate of .5lbs/ft. How much work is done in lifting the sand 80ft?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
The interior angles formed by the side of a hexagon have measures of them up to 720° what is the measure of angle a
Answers: 2
question
Mathematics, 21.06.2019 22:30
Solve the equation. 2x - 8(x+1)= 6(2x - 3)
Answers: 1
question
Mathematics, 21.06.2019 23:00
Bobs burgers bam has a special deal of 4 hamburgers for $6. at that rate, how much should it cost to buy 3 hamburgers?
Answers: 1
question
Mathematics, 22.06.2019 00:00
Technicians have installed a center pivot, circular irrigator for a farm that covers 25 acres. a.) how long is the irrigation boom (in feet) from the center pivot to its farthest extent? b.) if the irrigation boom makes 4 full revolutions in a day, how many miles does the end of the boom travel in 5 days?
Answers: 1
You know the right answer?
A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is...
Questions
question
English, 10.03.2020 00:07
Questions on the website: 13722359