Setup time on a certain production machine is 2.0 hr. Batch size is 60 parts, and operation cycle time is 2.0 min. Parts are processes sequentially. The reliability of this machine is characterized by a mean time between failures of 40 hr and a mean time to repair of 5 hr. Taking into account the availability of the machine, the average hourly production rate is closest to: a. 14 pc/hr b. 11 pc/hr c. 12 pc/hr d. 15 pc/hr e. 13 pc/hr

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Alawn mower manufacturer incurs a total of 34,816 in overhead costs and 388 per lawn mower in production costs. how many lawn mowers were manufactured if the average cost of productions is 660
Answers: 3
question
Mathematics, 21.06.2019 16:00
Aline has a slope of 1/4 and passes through point (0.4,-1/2). what is the value of the y-intercept?
Answers: 2
question
Mathematics, 21.06.2019 17:00
How do businesses a country's economy? a. by investing in goods and services b. by increasing the unemployment rate c. by making profits
Answers: 2
question
Mathematics, 22.06.2019 00:00
I've been working on this for a few days and i just don't understand, it's due in a few hours. you.the direction of a vector is defined as the angle of the vector in relation to a horizontal line. as a standard, this angle is measured counterclockwise from the positive x-axis. the direction or angle of v in the diagram is Ξ±.part a: how can you use trigonometric ratios to calculate the direction Ξ± of a general vector v = < x, y> similar to the diagram? part bsuppose that vector v lies in quadrant ii, quadrant iii, or quadrant iv. how can you use trigonometric ratios to calculate the direction (i.e., angle) of the vector in each of these quadrants with respect to the positive x-axis? the angle between the vector and the positive x-axis will be greater than 90 degrees in each case.part cnow try a numerical problem. what is the direction of the vector w = < -1, 6 > ?
Answers: 1
You know the right answer?
Setup time on a certain production machine is 2.0 hr. Batch size is 60 parts, and operation cycle ti...
Questions
Questions on the website: 13722367