subject
Mathematics, 29.07.2019 01:30 naimareiad

Jean and mark are going to fill a pool with 2 different sized hoses. jean can fill the pool in 8 hours, while mark can complete it in 12 hours. their supervisor thinks that the job will take 10 hours to complete if they work together. explain each step in solving the equation, and determine if the supervisor is correct or not.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
What’s the answer ? use the picture to see the problem
Answers: 2
question
Mathematics, 21.06.2019 22:00
Tom drove 206 miles in 3.9 hours. estimate his average speed.
Answers: 2
question
Mathematics, 22.06.2019 00:30
The length of a rectangle plus its width is 24 cm. the area is 143 square cm. what are the length and width of the rectangle?
Answers: 1
question
Mathematics, 22.06.2019 01:40
At wind speeds above 1000 centimeters per second (cm/sec), significant sand-moving events begin to occur. wind speeds below 1000 cm/sec deposit sand and wind speeds above 1000 cm/sec move sand to new locations. the cyclic nature of wind and moving sand determines the shape and location of large dunes. at a test site, the prevailing direction of the wind did not change noticeably. however, the velocity did change. fifty-nine wind speed readings gave an average velocity of x = 1075 cm/sec. based on long-term experience, σ can be assumed to be 245 cm/sec. (a) find a 95% confidence interval for the population mean wind speed at this site. (round your answers to the nearest whole number.) lower limit cm/sec upper limit cm/sec
Answers: 2
You know the right answer?
Jean and mark are going to fill a pool with 2 different sized hoses. jean can fill the pool in 8 hou...
Questions
question
Biology, 20.08.2020 03:01
question
Mathematics, 20.08.2020 03:01
question
Mathematics, 20.08.2020 03:01
question
Mathematics, 20.08.2020 03:01
question
Mathematics, 20.08.2020 03:01
Questions on the website: 13722363