Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill material will be hauled to the site in 21 cy loose measure trucks. the cycle time for a truck is 40 min. per trip. the swell factor for the earth is 25% and the shrinkage factor is 10%. assume 8 hours per day and a 45-min. effective hour. determine the number of required trucks to complete the project in 32 days.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 17:00
After a car's engine has been running for a while, if you stand near the car's engine you can often feel heat coming from the engine as a result of a. radiation b. convection c. conduction
Answers: 1
question
Physics, 22.06.2019 09:30
Gasoline comes from petroleum, which is made from ancient living things. petroleum, therefore, contains a type of energy. a. heat b. nuclear c. biological d. chemical potential
Answers: 2
question
Physics, 22.06.2019 11:00
How do we measure or think of speed in the united states?
Answers: 1
question
Physics, 22.06.2019 12:30
What’s #16 asking me and how do i solve it?
Answers: 2
You know the right answer?
Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill ma...
Questions
question
Engineering, 17.06.2021 15:20
Questions on the website: 13722362