Suppose that the amount of time it takes to build a highway varies directly with the length of the highway and inversely with the number of workers. suppose also that it takes 200 workers 3 weeks to build 2 miles of highway. how many miles of highway could 250 workers build in 6 weeks?
Answers: 2
Physics, 21.06.2019 21:00
When a neutral charge, comes into contact with a positive charge they repel each other nothing happens the neutral charge becomes negative they attract each other
Answers: 3
Physics, 22.06.2019 00:40
The rigid beam is supported by the three suspender bars. bars ab and ef are made of aluminum and bar cd is made of steel. if each bar has a cross-sectional area of 450 mm2, determine the maximum value of p if the allowable stress is (Οallow)st = 200 mpa for the steel and ( Οallow)al = 150 mpa for the aluminum. est = 200 gpa and eal = 70 gpa.
Answers: 1
Physics, 22.06.2019 05:30
Acombination reaction is when two or more combine to form one product. a decomposition reaction is when a substance breaks down into two or more simpler substances in a chemical reaction.
Answers: 1
Physics, 22.06.2019 08:30
What is the primary force that suspension bridges use cables to hold their spans up? a. tension force b. resistance force c. normal force d. elastic force e. applied force
Answers: 3
Suppose that the amount of time it takes to build a highway varies directly with the length of the h...
History, 25.01.2021 20:50
Advanced Placement (AP), 25.01.2021 20:50
Health, 25.01.2021 20:50
Biology, 25.01.2021 20:50
Biology, 25.01.2021 20:50