subject
Physics, 17.01.2020 01:31 bentonknalige

A300-foot cable weighing 6 pounds per foot is hanging from a winch 300 feet above ground level. find the work (in ft-lb) done in winding up the cable when there is a 200-pound load attached to the end of the cable.

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 23:20
Which quantities are scalars? choose all that apply a.distance b.speed c. acceleration d.velocity
Answers: 2
question
Physics, 22.06.2019 04:00
Ametal ball with a mass of 0.028 kg is dropped from rest at a height of 1.0 meters above the ground. assuming the energy in the ball is conserved, how much kinetic energy will the ball have when it is 0.5 meters above the ground?
Answers: 1
question
Physics, 22.06.2019 12:10
An ionic compound can conduct electricity when a it is dissolved in water b its crystals are ground into powder c it is in solid form d it is heated to just below its melting point
Answers: 1
question
Physics, 22.06.2019 15:30
What are the north and south poles of a solenoid change with?
Answers: 1
You know the right answer?
A300-foot cable weighing 6 pounds per foot is hanging from a winch 300 feet above ground level. find...
Questions
question
Mathematics, 09.07.2019 03:10
question
Mathematics, 09.07.2019 03:10
Questions on the website: 13722362