Physics, 27.03.2021 14:00 QueenLife4869
The work done in lifting a brick of mass 2kg through a height of 5m above the ground will be
(A)2.5J
(B)10J
(C)50J
(D)100J
Answers: 1
Physics, 23.06.2019 08:00
The cheetah is considered the fastest running animal in the world. cheetahs can accelerate to a speed of 20.1 m/s in 2.50 s and can continue to accelerate to reach a top speed of 28.1 m/s. assume the acceleration is constant until the top speed is reached and is zero thereafter.1) starting from a crouched position, how long does it take a cheetah to reach its top speed? (express your answer to three significant figures.) s2) how far does it travel in that time? (express your answer to three significant figures.) m3) if a cheetah sees a rabbit 120 m away, how long will it take to reach the rabbit, assuming the rabbit does not move? (express your answer to three significant figures.)
Answers: 3
Physics, 23.06.2019 08:30
Which equation is mostly likely used to determine the acceleration from a velocity vs time graph
Answers: 1
Physics, 23.06.2019 10:00
The standard cell potential (e°cell) for the reaction below is +0.63 v. the cell potential for this reaction is when the concentration of zn2+ = 1.0 m and the concentration of pb2+ = 2.0 x 10-4 m. pb2+(aq) + zn(s) > zn2+(aq) + pb(s)
Answers: 2
The work done in lifting a brick of mass 2kg through a height of 5m above the ground will be
(A)2.5...
Computers and Technology, 12.03.2020 18:30
Computers and Technology, 12.03.2020 18:30