subject

8. A machine producing a large spool of cable puts out 2.5 feet at a time. After each 2.5 feet of cable, there's a 1/1000 chance that the machine will cut the cable instead of continuing production. What is the expected length of the next
cable the machine produces?
a) 0.0025 ft. b) 400 ft. c) 2,500 ft. d) 6,250 ft. e)2,500,000 ft.

ansver
Answers: 1

Another question on Advanced Placement (AP)

question
Advanced Placement (AP), 22.06.2019 18:30
Me guys ! software enables between different types of software and between software and hardware. a. communication b. input c. output d. distribution
Answers: 1
question
Advanced Placement (AP), 23.06.2019 16:50
Often, leaders must be honest, even when what they have to say is not appealing or positive. explain why honesty is an important leadership quality.
Answers: 1
question
Advanced Placement (AP), 25.06.2019 09:00
4. when a child cries out during rough play, the caregiver should a. encourage the distressed child to fight back. b. respond immediately, since the behavior has changed to fighting. c. ignore it, because rough play is a natural part of children’s learning. d. ignore the request for unless there has been an injury. i need answer
Answers: 1
question
Advanced Placement (AP), 26.06.2019 03:00
Mrs. foyle told yolanda that her test had 38 problems worth a total of 100 points. each test problem is worth either 5 points or 2 points. yolanda wanted to determine how many 2-point and how many 5-point questions are on the test. in the space below, determine how many questions of each point-value are on the test. show your work or provide an explanation to support your answer. need this asap
Answers: 1
You know the right answer?
8. A machine producing a large spool of cable puts out 2.5 feet at a time. After each 2.5 feet of ca...
Questions
question
English, 02.12.2021 16:40
question
Business, 02.12.2021 16:40
question
Health, 02.12.2021 16:40
question
History, 02.12.2021 16:40
question
Spanish, 02.12.2021 16:40
Questions on the website: 13722359