subject
Biology, 25.07.2021 19:20 trekey36

Risk assessment is often used to set “acceptable” levels of toxins for the environment. Propose a concern people may have about using risk assessment in this way.

ansver
Answers: 3

Another question on Biology

question
Biology, 21.06.2019 19:00
Can someone me with this and tell me what’s fracking and what does it have to do with carbon, carbon dioxide, or fossil fuels?
Answers: 2
question
Biology, 22.06.2019 00:30
Consider this plant cell which organelle is labeled g
Answers: 1
question
Biology, 22.06.2019 07:00
Which is the graph of the piecewise function f(x)? f(x) = image for option 1 image for option 2 image for option 3 image for option 4
Answers: 3
question
Biology, 22.06.2019 09:30
Juan and carol were studying invertebrates in biology. they knew that segmented or earth worms preferred a dark, moist habitat. during this lab, they would be investigating the responses of organisms called planaria or dugesia tigrina. these were simple flatworms that still had a one-way digestive system and a very simple nervous system. juan and carol placed the planaria in a petri dish containing cool, distilled water that was partially covered with black paper. they shined a light on the dish. next, they removed the paper and placed a small amount of chicken liver at one end of the dish. they added a few large salt crystals to the water. finally, they added drops of hot water to the cool water in the petri dish. their results can be seen in the data table. according to their experiment, all but one conclusion is valid.
Answers: 1
You know the right answer?
Risk assessment is often used to set “acceptable” levels of toxins for the environment. Propose a co...
Questions
question
Mathematics, 15.04.2020 19:19
question
Mathematics, 15.04.2020 19:19
question
Mathematics, 15.04.2020 19:19
Questions on the website: 13722367