subject
Business, 19.07.2019 11:00 ashantiwilliams11120

When horizontally scaling, the allocation of resources is referred to as and the releasing of resources is referred to as a. scaling up, scaling down b. scaling down, scaling up c. scaling in, scaling out d. scaling out, scaling in?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 10:30
The advertisement demonstrates a popular way companies try to sell a product. what should consumers consider when it comes to the price of this product? it includes shipping and handling costs. it takes into account maintenance costs. it explains why this price is a good deal. it makes the full cost appears lower than it is.
Answers: 1
question
Business, 22.06.2019 11:50
Select the correct answer. ramon applied to the state university in the city where he lives, but he was denied admission. what should he do now? a.change his mind about graduating and drop out of high school so he can start working right away. b. decide not to go to college, because he didn’t have a backup plan. c.stay positive and write a mean letter to let the college know that they made a bad decision. d. learn from this opportunity, reevaluate his options, and apply to his second and third choices.
Answers: 2
question
Business, 22.06.2019 19:30
About 20 years ago, sturdy light, inc., produced a sturdy, lightweight backpack in a market that was rapidly growing. sturdy light became a leader in this market. eventually, the backpack market reached the maturity stage and slowed down. however, by this time, sturdy light had developed a strong brand name and continued to steadily lead the market. which of the following describes this scenario? a. sturdy light was a star that developed into a cash cow. b. sturdy light was a question mark that developed into a star. c. sturdy light was a dog that developed into a question mark. d. sturdy light was a cash cow that developed into a star.
Answers: 2
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
When horizontally scaling, the allocation of resources is referred to as and the releasing of resou...
Questions
question
Health, 09.11.2020 18:40
question
Mathematics, 09.11.2020 18:40
question
Biology, 09.11.2020 18:40
question
Mathematics, 09.11.2020 18:40
Questions on the website: 13722359