subject
Business, 27.06.2019 00:10 domie5910

The maximum height of a vehicle that can safely pass under a bridge is 12 feet 5 inches. a truck measures 162inches in height. which best explains whether or not the truck can pass safely under the bridge? the truck can pass safely under the bridge. the truck is 13 inches shorter than the maximum height. the truck cannot pass safely under the bridge. the truck is 13 inches taller than the maximum heightthe truck can pass safely under the bridge. the truck is 12 inches shorter than the maximum height. the truck cannot pass safely under the bridge. the truck is 12 inches taller than the maximum height.

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 13:30
Tom has brought $150,000 from his pension to a new job where his employer will match 401(k) contributions dollar for dollar. each year he contributes $3,000. after seven years, how much money would tom have in his 401(k)?
Answers: 3
question
Business, 22.06.2019 15:40
Aprice control is: question 1 options: a)a tax on the sale of a good that controls the market price.b)an upper limit on the quantity of some good that can be bought or sold.c)a legal restriction on how high or low a price in a market may go.d)control of the price of a good by the firm that produces it.
Answers: 1
question
Business, 22.06.2019 21:00
Suppose either computers or televisions can be assembled with the following labor inputs: units produced 1 2 3 4 5 6 7 8 9 10 total labor used 3 7 12 18 25 33 42 54 70 90 (a) draw the production possibilities curve for an economy with 54 units of labor. label it p54. (b) what is the opportunity cost of the eighth computer? (c) suppose immigration brings in 36 more workers. redraw the production possibilities curve to reflect this added labor. label the new curve p90.
Answers: 2
question
Business, 22.06.2019 21:00
Mr. beautiful, an organization that sells weight training sets, has an ordering cost of $40 for the bb-1 set. (bb-1 stands for body beautiful number 1.) the carrying cost for bb-1 is $5 per set per year. to meet demand, mr. beautiful orders large quantities of bb-1 seven times a year. the stockout cost for bb-1 is estimated to be $50 per set. over the past several years, mr. beautiful has observed the following demand during the lead time for bb-1: demand during lead time probability40 0.150 0.260 0.270 0.280 0.290 0.1total 1.0the reorder point for bb-1 is 60 sets. what level of safety stock should be maintained for bb-1?
Answers: 3
You know the right answer?
The maximum height of a vehicle that can safely pass under a bridge is 12 feet 5 inches. a truck mea...
Questions
question
Mathematics, 18.08.2019 22:00
question
Mathematics, 18.08.2019 22:00
Questions on the website: 13722363