subject
Business, 03.09.2019 20:10 jia699

Andrew's mother knew something about planning since she was, in fact, a financial planner-a person who others to plan the best way they can manage their money. she explained that financial planning is common sense, like good nutrition in that there's nothing wrong with driving a nice suv just like there's nothing wrong with having potato chips and colas, as long as you do it in moderation, as part of a somewhat balanced plan or diet. she added that people are unlikely to get a heart attack from an occasional bowl of potato chips and are equally unlikely to be driven into bankruptcy if they use their credit cards in moderation. however, she concluded, a constant diet of chips or credit cards could be hazardous to one's physical or financial health.
joey asked how much was too much and andrew's mom answered that the amount could only be determined as part of a person's lifetime financial plan. "nearly everybody has some sort of plan in their mind, even though they don't know that they have a plan. otherwise, they'd spend everything they have the moment they got it."
why does andrew's mother say that most people have a lifetime financial plan even though they don't know it?
a. most people have been through bankruptcy and have their plans decided by the courts.
b. you must do a financial plan to get into college.
c. most people have been to a professional financial planner.
d. most people have some idea of what they want their lives to be and this regulate their spending and saving.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 22:20
Which of the following best explains why the demand for housing is more flexible than the supply? a. new housing developments are being constructed all the time. b. low interest rates for mortgages make buying a home very affordable. c. the increasing population always drives demand upwards. d. people can move more easily than producers can build new homes.
Answers: 1
question
Business, 22.06.2019 22:20
With q7 assume the sweet company uses a plantwide predetermined overhead rate with machine-hours as the allocation base.and for q 10,11,13,and 14,assume that the company use department predetermined overhead rates with machine-hours as the allocation bade in both departements.7. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answers to nearest whole dollar.)total price for the job for job p -job q selling price per unit for job p q . how much manufacturing overhead was applied from the molding department to job p and how much was applied to job q? (do not round intermediate calculations.) job p job q manufacturing overhead applied for job p for job q . how much manufacturing overhead was applied from the fabrication department to job p and how much was applied to job q? (do not round intermediate calculations.)job p job q manufacturing overhead applied for job p for job q . if job q included 30 units, what was its unit product cost? (do not round intermediate calculations. round your final answer to nearest whole dollar.)14. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answer to nearest whole dollar.)total price for the job p for job q selling price per unit for job p for job q
Answers: 1
question
Business, 23.06.2019 00:30
Three years ago, the city of recker committed to build a park and music venue by the river. it was expected to cost $2.5 million and be paid for from an additional meals tax in the community. the residents pushed back. local restaurants suffered as people ate out less or patronized restaurants in neighboring communities. the project has stalled, but the town council kept pushing it on. this spring, a flood devastated the venue. the town council appears to have suffered from bias
Answers: 3
question
Business, 23.06.2019 02:20
Speedy auto repairs uses a job-order costing system. the company’s direct materials consist of replacement parts installed in customer vehicles, and its direct labor consists of the mechanics’ hourly wages. speedy’s overhead costs include various items, such as the shop manager’s salary, depreciation of equipment, utilities, insurance, and magazine subscriptions and refreshments for the waiting room. the company applies all of its overhead costs to jobs based on direct labor-hours. at the beginning of the year, it made the following estimates: direct labor-hours required to support estimated output 20,000 fixed overhead cost $ 350,000 variable overhead cost per direct labor-hour $ 1.00 required: 1. compute the predetermined overhead rate. 2. during the year, mr. wilkes brought in his vehicle to replace his brakes, spark plugs, and tires. the following information was available with respect to his job: direct materials $ 590 direct labor cost $ 109 direct labor-hours used 6
Answers: 1
You know the right answer?
Andrew's mother knew something about planning since she was, in fact, a financial planner-a person w...
Questions
question
Biology, 29.01.2020 14:59
question
Mathematics, 29.01.2020 14:59
question
Mathematics, 29.01.2020 14:59
Questions on the website: 13722360