subject
Business, 18.09.2019 19:10 hardwick744

Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 154,000 fixed manufacturing overhead cost $ 656,000 variable manufacturing overhead cost per machine-hour $ 4.50 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 390 direct labor cost $ 240 machine-hours used 35 compute the total manufacturing cost assigned to job 400. 3. if job 400 includes 50 units, what is the unit product cost for this job? 4. if moody uses a markup percentage of 120% of its total manufacturing cost, then what selling price per unit would it have established for job 400?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 01:00
An investment counselor calls with a hot stock tip. he believes that if the economy remains strong, the investment will result in a profit of $40 comma 00040,000. if the economy grows at a moderate pace, the investment will result in a profit of $10 comma 00010,000. however, if the economy goes into recession, the investment will result in a loss of $40 comma 00040,000. you contact an economist who believes there is a 2020% probability the economy will remain strong, a 7070% probability the economy will grow at a moderate pace, and a 1010% probability the economy will slip into recession. what is the expected profit from this investment?
Answers: 2
question
Business, 22.06.2019 06:30
Select all that apply. select the ways that labor unions can increase wages. collective bargaining reducing the labor supply increasing the demand for labor creating monopolies
Answers: 1
question
Business, 22.06.2019 19:30
The owner of firewood to go is considering buying a hydraulic wood splitter which sells for $50,000. he figures it will cost an additional $100 per cord to purchase and split wood with this machine, while he can sell each cord of split wood for $125. if, for this machine, design capacity is 50 cords per day, effective capacity is 40 cords per day, and actual output is expected to be 32 cords per day, what would be its efficiency?
Answers: 1
question
Business, 23.06.2019 00:30
Activity-based costing (abc) is not truly a cost collection mechanism as much as it is an inventory valuation method. the main purpose for implementing an activity-based cost system is to try to overcome some of the cost distortions that occur in traditional costing from product differences when there are variations in size and complexity. however, one of the disadvantages of utilizing abc is that the additional information gathering necessary to implement costing with that level of detail might be beyond the reach of some companies with resource or financial constraints. with this in mind, what kinds of industries or companies do you think would benefit most from using activity-based costing and why? in designing or modifying an accounting system to capture appropriate costs for abc, what considerations do you think would need to be made?
Answers: 3
You know the right answer?
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based...
Questions
question
Chemistry, 29.07.2019 03:30
Questions on the website: 13722360