subject
Business, 07.10.2019 18:30 Squara

Due to a strike in its supplier’s plant, andretti company is unable to purchase more material for the production of daks. the strike is expected to last for two months. andretti company has enough material on hand to operate at 25% of normal levels for the two-month period. as an alternative, andretti could close its plant down entirely for the two months. if the plant were closed, fixed manufacturing overhead costs would continue at 35% of their normal level during the two-month period and the fixed selling expenses would be reduced by 20% during the two-month period. (round number of units produced to the nearest whole number. round your intermediate calculations and final answers to 2 decimal places. any losses/reductions should be indicated by a minus sign.) a. how much total contribution margin will andretti forgo if it closes the plant for two months? b. how much total fixed cost will the company avoid if it closes the plant for two months? c. what is the financial advantage (disadvantage) of closing the plant for the two-month period?

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 17:00
Cadbury has a chocolate factory in dunedin, new zealand. for easter, it makes two kinds of “easter eggs”: milk chocolate and dark chocolate. it cycles between producing milk and dark chocolate eggs. the table below provides data on these two products. demand (lbs per hour) milk: 500 dark: 200 switchover time (minutes) milk: 60 dark: 30 production rate per hour milk: 800 dark: 800 for example, it takes 30 minutes to switch production from milk to dark chocolate. demand for milk chocolate is higher (500lbs per hour versus 200 lbs per hour), but the line produces them at the same rate (when operating): 800 lbs per hour. a : suppose cadbury produces 2,334lbs milk chocolate and 1,652 lbs of dark chocolate in each cycle. what would be the maximum inventory (lbs) of milk chocolate? b : how many lbs of milk and dark chocolate should be produced with each cycle so as to satisfy demand while minimizing inventory?
Answers: 2
question
Business, 22.06.2019 18:00
What would not cause duff beer’s production possibilities curve to expand in the short run? a. improved manufacturing technology b. additional resources c. increased demand
Answers: 1
question
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
question
Business, 22.06.2019 23:30
What is the difference between career options in the law enforcement pathway and career options in the correction services pathway?
Answers: 1
You know the right answer?
Due to a strike in its supplier’s plant, andretti company is unable to purchase more material for th...
Questions
question
History, 24.12.2019 17:31
Questions on the website: 13722363