Ismail construction enters into a contract to design and build a hospital. ismail is responsible for the overall management of the project and identifies various goods and services to be provided, including engineering, site clearance, foundation, procurement, construction of the structure, piping and wiring, installation of equipment, and finishing. does ismail have a single performance obligation to the customer in this revenue arrangement? explain.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 14:50
Prepare beneish corporation's income statement and statement of stockholders' equity for year-end december 31, and its balance sheet as of december 31. there were no stock issuances or repurchases during the year. (do not use negative signs with your answers unless otherwise noted.)
Answers: 2
question
Business, 22.06.2019 15:00
Because gloria's immediate concern was the perceived gender discrimination, she would be more concerned about than intent, resultsresults, intentstatistics, trendsrace,gendergender,race
Answers: 2
question
Business, 22.06.2019 23:20
2. the external environment (connect)choose whether each example belongs in the general, task, or internal environment.exampleenvironmenta worldwide recession task environment / general environment / internal environmentlocal mothers asking their community grocery store to carry no-salt cheerios-type cereal for their babies task environment / general environment / internal environmentchoose the phrase that best completes the following sentence.the relationship between the task environment and the general environment is best described as: a one-way system: changes in the task environment affect the general environment, but changes in the general environment do not affect the task environment.an open system: changes in the task environment affect the general environment, and changes in the general environment affect the task environment.a one-way system: changes in the general environment affect the task environment, but changes in the task environment do not affect the general environment.a closed system: changes in the general environment do not affect the task environment, and changes in the task environment do not affect the general environment.©bloomberg via getty imagesmanagement in the newsin april 2010, the explosion of british petroleum’s (bp) deepwater horizon oil drilling rig and the accompanying oil spill dramatically changed the external environment in which all oil companies operate. the explosion released more oil than any other accidental spill in history and had a huge impact on the waters and surrounding communities of the gulf coast. the conditions that led to the spill, the attempts to stop the spill, and the clean-up and aftermath of the spill prompted debates in the u.s. senate, concern on wall street, and attention from companies all over the world.match each oil spill event with a specific dimension of the general environment.eventgeneral environment dimensionbp stock prices falling 25% during the first month after the oil spill oil seeping into pelican nesting grounds, which will place the brown pelican back on the endangered species list people moving from louisiana to oklahoma to avoid the effects of the spill
Answers: 2
question
Business, 23.06.2019 01:10
1. alwaysrain irrigation, inc. would like to determine capacity requirements for the next four years. currently, two production lines are in place for making bronze and plastic sprinklers. three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. management has forecast demand for the next four years as follows: both production lines can produce all the different types of nozzles. the bronze machines needed for the bronze sprinklers require two operators and can produce up to 12,000 sprinklers. the plastic injection molding machine needed for the plastic sprinklers requires four operators and can produce up to 200,000 sprinklers. three bronze machines and only one injection molding machine are available. what are the capacity requirements for the next four years? (assume that there is no learning.)