subject
Business, 16.10.2019 01:30 alyssaboosiefkes

At the end of june, the job cost sheets of racing wheels, inc., shows the following total costs accumulated on three custom jobs: job 102 job 103 job 104direct materials $15,000 $33,000 $27,000direct labor 8,000 14,200 21,000overhead 4,000 7,100 10,500job 102 began production in may, and the following costs were assigned to it in may: direct materials $6,000; direct labor $1,800; and overhead $900. jobs 103 and 104 began in june. one applies overhead cost with a predetermined rate based on direct labor cost. jobs 102 and 103 are finished in june, and job 104 is expected to be finished in july. no raw materials are used indirectly in june. using this information, answer the following questions: what is the cost of the raw materials requisitioned in june for each of the three jobs? how much direct labor cost is incurred during june for each of the three jobs? what predetermined overhead rate is used during june? how much total cost is transferred to finished goods during june?

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 04:00
Assume that the following conditions exist: a. all banks are fully loaned up- there are no excess reserves, and desired excess reserves are always zero. b. the money multiplier is 5 .     c. the planned investment schedule is such that at a 4 percent rate of interest, investment =$1450 billion. at 5 percent, investment is $1420 billion. d. the investment multiplier is 3 . e.. the initial equilibrium level of real gdp is $12 trillion. f. the equilibrium rate of interest is 4 percent now the fed engages in contractionary monetary policy. it sells $1 billion worth of bonds, which reduces the money supply, which in turn raises the market rate of interest by 1 percentage point. calculate the decrease in money supply after fed's sale of bonds: $nothing billion.
Answers: 2
question
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
question
Business, 22.06.2019 13:40
Horace society is planning its annual western fair raceway gala. the gala committee has assembled the following expected costs for the event: dinner (per person) $10 gaming token and program (per person) $2 prize payouts $4,300 tickets and advertising $800 private box suite rental $1,700 lottery licenses $200 the committee members would like to charge $40 per person for the evening’s activities.required: 1. what is the break-even point for the dinner-dance (in terms of the number of persons who must attend)? 2. assume that last year only 200 persons attended the dinner-dance. if the same number attend this year, what price per ticket must be charged in order to break even? 3. refer to the original data ($40 ticket price per person). prepare a cvp graph for the dinner- dance from zero tickets up to 600 tickets sold.
Answers: 2
question
Business, 22.06.2019 23:00
Which completes the equation? o + a + consideration (+ = k legal capacity legal capability legal injunction legal corporation
Answers: 1
You know the right answer?
At the end of june, the job cost sheets of racing wheels, inc., shows the following total costs accu...
Questions
question
Mathematics, 02.06.2021 18:20
Questions on the website: 13722362