subject
Business, 30.10.2019 22:31 lolirdc

Rocky mountain corporation makes two types of hiking boots—xactive and pathbreaker. data concerning these two product lines appear below: xactive pathbreaker direct materials per unit $ 65.50 $ 51.70 direct labor cost per unit $ 18.90 $ 13.70 direct labor-hours per unit 1.4 dlhs 1 dlhs estimated annual production and sales 32,000 units 82,000 unitsthe company has a conventional costing system in which manufacturing overhead is applied to units based on direct labor-hours. data concerning manufacturing overhead and direct labor-hours for the upcoming year appear below: estimated total manufacturing overhead $2,624,760 estimated total direct labor-hours 126,800 dlhsrequired: 1-a. compute the predetermined overhead rate based on direct labor-hours. (round the intermediate calculations and final answer to two decimal places.)1-b. using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product. (round the intermediate calculations and final answer to two decimal places.)2. the company is considering replacing its conventional costing system with an activity-based costing system that would assign its manufacturing overhead to the following four activity cost pools: estimated overhead cost expected activityactivity cost pools and activity measures xactive pathbreaker total supporting direct labor (direct labor-hours) $ 963,680 44,800 82,000 126,800 batch setups (setups) 963,500 285 185 470 product sustaining (number of products) 610,940 1 1 2 general factory (machine-hours) 86,640 3,200 8,200 11,400 total manufacturing overhead cost $ 2,624,760 determine the activity rate for each of the four activity cost pools. (round your final answers to 2 decimal places.)3. using the activity rates and other data from the problem, determine the unit product cost of each product. (round the intermediate calculations and final answer to two decimal places.)

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 10:10
Rats that received electric shocks were unlikely to develop ulcers if the
Answers: 1
question
Business, 22.06.2019 12:50
Afirm’s production function is represented by q(m,r) = 4m 3/4r1/3, where q denotes output, m raw materials, and r robots. the firm is currently using 6 units of raw materials and 12 robots. according to the mrts, in order to maintain its output level the firm would need to give up 2 robots if it adds 9 units of raw materials. (a) true (b) false
Answers: 3
question
Business, 22.06.2019 14:30
Bridge building company estimates that it will incur $1,200,000 in overhead costs for the year. additionally, the company estimates 50,000 direct labor hours will be spent building custom walking bridges for the year at a total direct labor cost of $600,000. what is the predetermined overhead rate for bridge building company if direct labor costs are to be used as an allocation base?
Answers: 3
question
Business, 22.06.2019 20:40
Asmall town wants to build some new recreational facilities. the proposed facilities include a swimming pool, recreation center, basketball court and baseball field. the town council wants to provide the facilities which will be used by the most people, but they face budget and land limitations. the town has $400,000 and 14 acres of land. the pool requires locker facilities which would be in the recreation center, so if the swimming pool is built the recreation center must also be built. also, the council has only enough flat land to build the basketball court or the baseball field. the daily usage and cost of the facilities (in $1,000) are shown below. which facilities should they build? facilityusagecost ($1,000)landswimming pool4001002recreation center5002003basketball court3001504baseball field2001005
Answers: 1
You know the right answer?
Rocky mountain corporation makes two types of hiking boots—xactive and pathbreaker. data concerning...
Questions
question
Mathematics, 17.10.2019 03:10
question
Mathematics, 17.10.2019 03:10
question
Biology, 17.10.2019 03:10
question
Physics, 17.10.2019 03:10
Questions on the website: 13722363