subject
Business, 19.11.2019 07:31 nerissa5

Agovernment is considering paving a highway with a newly developed "wear-proof" material. paving the highway would cost $4 billion today, but it would save $400 million in maintenance costs for each of the next 10 years. use the concept of present value to determine whether the project is worth undertaking if the government can borrow at an interest rate of 4%. is it worth it if the interest rate is 0%? 8%?

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 08:30
Uppose that the federal reserve purchases a bond for $100,000 from donald truck, who deposits the proceeds in the manufacturer’s national bank. what will be the impact of this purchase on the supply of money? the money supply will increase by $100,000. the money supply will increase by $80,000. the money supply will increase by $500,000. this action will have no effect on the money supply. if the reserve requirement ratio is 20 percent, what is the maximum amount of additional loans that the manufacturer’s bank will be able to extend as the result of truck’s deposit? the maximum additional loans is $100,000. the maximum additional loans is $80,000. the maximum additional loans is $20,000. the maximum additional loans is $500,000. given the 20 percent reserve requirement, what is the maximum increase in the quantity of checkable deposits that could result throughout the entire banking system because of the fed’s action? this action will have no effect on the money supply. the money supply will eventually increase by $80,000. the money supply will eventually increase by $500,000. the money supply will eventually increase by $100,000.
Answers: 1
question
Business, 22.06.2019 15:30
Brenda wants a new car that will be dependable transportation and look good. she wants to satisfy both functional and psychological needs. true or false
Answers: 1
question
Business, 22.06.2019 17:40
Solomon chemical company makes three products, b7, k6, and x9, which are joint products from the same materials. in a standard batch of 320,000 pounds of raw materials, the company generates 70,000 pounds of b7, 150,000 pounds of k6, and 100,000 pounds of x9. a standard batch costs $3,840,000 to produce. the sales prices per pound are $10, $14, and $20 for b7, k6, and x9, respectively. (a) allocate the joint product cost among the three final products using weight as the allocation base. (b) allocate the joint product cost among the three final products using market value as the allocation base. (c) allocate the joint product cost among the three final products using weight as the allocation base.
Answers: 3
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
You know the right answer?
Agovernment is considering paving a highway with a newly developed "wear-proof" material. paving the...
Questions
question
English, 13.07.2020 23:01
question
Mathematics, 13.07.2020 23:01
question
Mathematics, 13.07.2020 23:01
Questions on the website: 13722361