The standard cost of product 5252 includes 1.90 hours of direct labor at $14.30 per hour. the predetermined overhead rate is $22.00 per direct labor hour. during july, the company incurred 4,000 hours of direct labor at an average rate of $14.60 per hour and $80,100 of manufacturing overhead costs. it produced 2,000 units.
(a) compute the total, price, and quantity variances for labor.
(b) compute the total overhead variance.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 23:00
Which of the following statements is correct? large corporations are taxed more favorably than sole proprietorships. corporate stockholders are exposed to unlimited liability. due to limited liability, unlimited lives, and ease of ownership transfer, the vast majority of u.s. businesses (in terms of number of businesses) are organized as corporations. most businesses (by number and total dollar sales) are organized as partnerships or proprietorships because it is easier to set up and operate in one of these forms rather than as a corporation. however, if the business gets very large, it becomes advantageous to convert to a corporation, mainly because corporations have important tax advantages over proprietorships and partnerships. most business (measured by dollar sales) is conducted by corporations in spite of large corporations’ often less favorable tax treatment, due to legal considerations related to ownership transfers and limited liability.
Answers: 3
question
Business, 22.06.2019 15:30
Susan is a 5th grade teacher and loves getting up every day and going to work to teach her students. this is an example of a. extrinsic value b. interests c. intrinsic value d. external value
Answers: 2
question
Business, 22.06.2019 18:50
)a business incurs the following costs per unit: labor $125/unit, materials $45/unit, and rent $250,000/month. if the firm produces 1,000,000 units a month, calculate the following: a. total variable costs b. total fixed costs c. total costs
Answers: 1
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
The standard cost of product 5252 includes 1.90 hours of direct labor at $14.30 per hour. the predet...