Our demand for january is 20,000 units. each unit requires 0.5 square feet to store and we receive 2 deliveries per month. to design a new warehouse, we will take out a loan and pay $10 per square foot per month for 20 years. after careful planning designs, we have determined that only half our space will be used for storage of actual product (and the other half will be used for aisles, bathrooms, and loading docks). in addition, our warehouse costs $2 per square foot per month to operate. each unit we process in our warehouse costs $1 to ship out. alternatively, we are considering renting some space. at a cost of $14 per unit per month, an outside contractor is willing to store our product. in addition, they will charge us $2 per unit for shipping. determine the total cost for january if we design a 15,000 sq ft facility.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 20:30
Resources that are valuable but not rare can be categorized asanswers: organizational weaknesses.distinctive competencies.organizational strengths.complementary resources and capabilities.
Answers: 1
question
Business, 22.06.2019 11:00
While on vacation in las vegas jennifer, who is from utah, wins a progressive jackpot playing cards worth $15,875 at the casino royale. what implication does she encounter when she goes to collect her prize?
Answers: 1
question
Business, 22.06.2019 15:40
Colter steel has $5,550,000 in assets. temporary current assets $ 3,100,000 permanent current assets 1,605,000 fixed assets 845,000 total assets $ 5,550,000 assume the term structure of interest rates becomes inverted, with short-term rates going to 10 percent and long-term rates 2 percentage points lower than short-term rates. earnings before interest and taxes are $1,170,000. the tax rate is 40 percent earnings after taxes = ?
Answers: 1
question
Business, 22.06.2019 16:30
Corrective action must be taken for a project when (a) actual progress to the planned progress shows the progress is ahead of schedule. (b) the technical specifications have been met. (c) the actual cost of the activities is less than the funds received for the work completed. (d) the actual progress is less than the planned progress.
Answers: 2
You know the right answer?
Our demand for january is 20,000 units. each unit requires 0.5 square feet to store and we receive 2...
Questions
question
Mathematics, 22.07.2019 06:20
Questions on the website: 13722367