subject
Business, 20.02.2020 06:52 emanuel323

Effective internal control A. Eliminates risk and potential loss to the organization. B. Is unaffected by changing circumstances and conditions encountered by the organization. C. Cannot be circumvented by management. D. Assists with the safeguarding of assets.

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 21:30
Gino's restaurant is a popular restaurant in boston, massachusetts. the owner of the restaurant has been trying to better understand costs at the restaurant and has hired a student intern to conduct an activity-based costing study. the intern, in consultation with the owner, identified the following major activities: activity cost pool activity measure serving a party of diners number of parties served serving a diner number of diners served serving drinks number of drinks ordered some costs, such as the cost of cleaning the linens that cover the restaurant's tables, vary with the number of parties served. other costs, such as washing plates and glasses, depends on the number of diners served or the number of drinks served. data concerning these activities are shown below. serving a party serving a dinner serving drinks total total cost $47,600 $153,000 $59,800 $260,400 total activity 7,000 parties 30,000 diners 46,000 drinks prior to the activity-based costing study, the owner knew very little about the costs of the restaurant. she knew that the total cost for the month was $260,400 and that 30,000 diners had been served. therefore, the average cost per diner was $8.68.required: 1. compute the activity rates for each of the three activities 2. according to the activity-based costing system, what is the total cost of serving each of the following parties of diners? a. a party of four diners who ordered three drinks in total b. a party of two diners who do not order any drinks c. a lone diner who orders two drinks 3. convert the total costs you computed in part (1) above to costs per diner. in other words, what is the average cost per diner for serving each of the following parties: a. a party of four diners who order three drinks in total b. a party of two diner who do not order any drinks c. a lone diner who orders two drinks 4. why do the costs per diner for the three different parties differ from each other and from the overall average coast of $9.80 per diner?
Answers: 1
question
Business, 22.06.2019 05:00
One question from a survey was "how many credit cards do you currently have? " the results of the survey are provided. complete parts (a) through (g) below. click the icon to view the survey results. (a) determine the mean number of credit cards based on the raw data. the mean is 3.113.11 credit cards. (type an integer or a decimal. do not round.) (b) determine the standard deviation number of credit cards based on the raw data. the standard deviation is 1.9111.911 credit cards. (round to three decimal places as needed.) (c) determine a probability distribution for the random variable, x, the number of credit cards issued to an individual. x (# of cards) p(x) x (# of cards) p(x) 1 0.280.28 6 nothing 2 nothing 7 nothing 3 nothing 8 nothing 4 nothing 9 nothing 5 nothing 10 nothing (type integers or decimals. do not round.)
Answers: 2
question
Business, 22.06.2019 12:50
You are working on a bid to build two city parks a year for the next three years. this project requires the purchase of $249,000 of equipment that will be depreciated using straight-line depreciation to a zero book value over the three-year project life. ignore bonus depreciation. the equipment can be sold at the end of the project for $115,000. you will also need $18.000 in net working capital for the duration of the project. the fixed costs will be $37000 a year and the variable costs will be $148,000 per park. your required rate of return is 14 percent and your tax rate is 21 percent. what is the minimal amount you should bid per park? (round your answer to the nearest $100) (a) $214,300 (b) $214,100 (c) $212,500 (d) $208,200 (e) $208,400
Answers: 3
question
Business, 22.06.2019 15:30
For a firm that uses the weighted average method of process costing, which of the following must be true? (a) physical units can be greater than or less than equivalent units. (b) physical units must be equal to equivalent units. (c) equivalent units must be greater than or equal to physical units. (d) physical units must be greater than or equal to equivalent units.
Answers: 1
You know the right answer?
Effective internal control A. Eliminates risk and potential loss to the organization. B. Is unaffect...
Questions
question
Mathematics, 07.09.2021 06:00
question
Mathematics, 07.09.2021 06:00
question
Mathematics, 07.09.2021 06:00
question
Mathematics, 07.09.2021 06:00
Questions on the website: 13722361